Bon Tempe Trail (MMWD)
Shadyside: 1/29/01, CVR: This route is in reasonably good condition. However, the heavy traffic that this trail receives presents some maintenance challenges. In places, the tread has migrated down the hillside, and needs to be rebuilt. In places, tree roots should be cut out. Some of the steps need to be better backfilled, as they trap muddy pools in winter. Some of the water bars need to be cleaned and improved.
Sunnyside: 5/20/01, CVR: This route is in reasonably good condition.

